Feasibility Study

-
Final BRDC Implemenation Teams' Recommendation Statement on the Fate of the Four Dams on the Boardman River, 12/16/2008
-
Final Breach Report
-
Final Dam Engineering Report
-
Final Detailed Analysis Effect on Wetlands Part 1 of 3
-
Final Detailed Analysis Effect on Wetlands Part 2 of 3
-
Final Detailed Analysis Effect on Wetlands Part 3 of 3
-
Final Detailed Analysis of Alternatives Part 1 of 3
-
Final Detailed Analysis of Alternatives Part 2 of 3
-
Final Detailed Analysis of Alternatives Part 3 of 3
-
Final Economic Social Analysis
-
Final Economic Social Analysis Veritas
-
Final Engineering Evaluation
-
Final Fisheries Existing Data
-
Final Fisheries Habitat
-
Final Sediment Chemistry Data
-
Final Terrestrial Habitats Summary Part 1 of 5
-
Final Terrestrial Habitats Summary Part 2 of 5
-
Final Terrestrial Habitats Summary Part 3 of 5
-
Final Terrestrial Habitats Summary Part 4 of 5
-
Final Terrestrial Habitats Summary Part 5 of 5
-
Final Wetland Report
-
Final Wildlife Report
-
PowerPoint Presentation of Detailed Analysis of Alternatives including Results of Public Opinion Survey, 10/28/2008
-
Safety Inspection of Brown Bridge Dam prepared by STS for the City of Traverse City, Part 1/3, 9/2008
-
Safety Inspection of Brown Bridge Dam prepared by STS for the City of Traverse City, Part 2/3, 9/2008
-
Safety Inspection of Brown Bridge Dam prepared by STS for the City of Traverse City, Part 3/3, 9/2008
-
Safety Inspection of Union Street Dam prepared by STS for the City of Traverse City, 9/2008
-
PowerPoint Presentation for Special Meetings for Public Opinion Survey, Fall 2008
-
Fact Sheets for each of the six alternatives for managing the Boardman River Dams:
-
Powerpoint Presentation, August 2008: Economic and Social Analysis: Quantification of Exising Conditions
-
Historic Survey and Review of the Boardman Dams
-
Boardman Wetland Determination Report Part 1
-
Boardman Wetland Determination Report Part 2
-
Boardman Wetland Determination Report Part 3
-
Sediment Report Completed April 2008
-
Preliminary Engineering Evaluation of Existing Structures
-
Economic and Social baseline data
-
Boardman River Fisheries Report
-
Powerpoint Presentation: Boardman River Riparian Zone Wildlife Assessment
-
Summary of Terrestrial Habitats in the Boardman River Watershed
-
Drawdown Plan for Boardman Pond
-
Scope of Work dated June 30, 2008: This document outlines work items to be completed for the Engineering Feasibility Study for six alternatives including a public opinion survey.
-
Scope of Work: This document outlines all of the work items in the evaluation of possible alternative futures for the Boardman River.
-
Request for Qualifications: The Boardman River Dams Committee issued the RFQ to determine the interest, experience and capacities of organizations to complete the engineering and feasibility study.
